Monday to Saturday
View our 2018 financial prospectus brochure for an easy to read guide on all of the services offer.
Download BrochuresOur factory's breaking event is technically capable and transparent. Sugarcane is not broken without sugarcane inspection. The farmer's sugarcane is crushed. Therefore, the productivity of the farmers is increased.
54 percent of sugarcane registers in the work area have been crushed and 54 percent of sugarcane disposal has been done. In this area, 92 percent of sugarcane crushing has been made in the form of maximum machinery for this season.
However, 54% of the disposal of the cane has been disposed of due to early breakdown by the other factories of the Toning Program. Therefore, without taking breaks within ten to 12 months of the members, the members should stop the harvesting of sugarcane and stop the sugarcane crop production and help in the growing of sugarcane.
After many years of experience in Karnataka and drought-hit factories, due to increase in sugarcane area, long years of non-fermentation of sugarcane in our area has many years of experience.
Sr.No |
Particulars |
Season 2017-18 |
Season 2016-17 |
Season 2015-16 |
Season 2014-15 |
Season 2013-14 |
1 |
Installed Capacity (TCD) |
5000 |
5000 |
5000 |
5000 |
5000 |
2 |
Gross Days |
170 |
112 |
151 |
168 |
150 |
3 |
Total Cane Crushed(MIT) |
945675 |
635007 |
846224 |
862703 |
772318 |
4 |
Total net sugar production(Qlts.) |
1170395 |
781444 |
1057365 |
1076591 |
957343 |
5 |
Average recovery % cane (Excluding Binding material) |
12.38 |
12.31 |
12.50 |
12.48 |
12.40 |
6 |
Total Losses |
1.75 |
1.78 |
1.77 |
1.76 |
1.74 |
7 |
Sugar Exported(MIT) |
Nill |
Nill |
11440 |
Nill |
4160 |
8 |
Sugar color by GS 9/1/2/3-8 method (with analysis report) |
67 IU |
68 IU |
67 IU |
65 IU |
62 IU |
9 |
Sugar Production % Cane |
|||||
a) L-30 |
2.19 |
0.50 |
0.63 |
0.77 |
1.01 |
|
b) M1-30 |
39.41 |
35.78 |
53.75 |
51.87 |
52.43 |
|
c) M2-30 |
18.02 |
6.76 |
--- |
--- |
--- |
|
d) S1-30 |
38.43 |
53.57 |
34.01 |
43.15 |
32.78 |
|
e) S2-30 |
--- |
--- |
7.96 |
--- |
11.06 |
|
f) SS-31 |
1.95 |
3.39 |
3.65 |
4.21 |
2.72 |